The Weekly EV Charging Briefing.
One email a week. Just EV news that matters, with a TLDR at the top so you can skip what doesn't apply to you.
By subscribing you agree to our Privacy Policy. Unsubscribe any time.
What you'll get
- One issue per week, every week: no bursts, no silences
- TLDR section at the top: scan in 60 seconds or read the full thing
- News on incentives, technology, infrastructure, and policy
- Plain-language summaries with links to the primary sources
- No sponsored recommendations, no affiliate links
Recent issues
View archive →- Nov 9
Oregon Suspends Its EV Rebate and Opens a Third NEVI Round, Eversource Massachusetts Closes Its 2026 Charger Rebate, Pennsylvania Awards $37 Million for 515 Ports, and New York and Illinois Programs Stay Open
This issue covers the three weeks since October 19. Oregon DEQ suspended its Clean Vehicle Rebate on November 5 for lack of funds, while ODOT opened a third NEVI round for at least 20 fast-charging stations, with applications due January 22, 2027. Eversource's Massachusetts residential charger rebate closed to 2026 applications on November 1, and its commercial program reserves funds only under an agreement executed by December 31. PennDOT awarded $37 million in federal NEVI funds for 515 public ports in the Philadelphia region on October 28. NYSERDA's Charge Ready NY 2.0 still pays $3,000 per Level 2 port plus site bonuses of up to $14,000, and the Illinois EPA's EV rebate cycle is open through December 31.
- Oct 19
US Fast Charging Passes 80,000 Ports While Prices Climb, Arizona Opens Its First Federally Funded Stations, Texas Has 22 Open and 321 More Funded, and Seattle Takes Requests for Curbside Chargers
Paren's third-quarter report counts 80,964 fast-charging ports at 14,614 US stations, with 50.4 million sessions in the quarter, up 26% from a year earlier, and an average price of 54 cents per kWh; Tesla's non-member price rose 15% to 56.9 cents. Arizona opened its first three NEVI-funded stations on October 14 in Tucson, Green Valley, and Wellton, and proposals for 49 more stations are due January 15, 2027. TxDOT says 22 of its first-phase stations are open and it has awarded $226 million for 321 more. Seattle City Light and SDOT are taking requests for up to 200 curbside Level 2 chargers by 2030, with applications open through fall 2027.
- Oct 12
California Opens $28 Million for Public Fast Chargers at Up to $100,000 a Port, Electrify America Lets Retailers Run Their Own Branded Networks, Pilot and Tesla Open Their First Semi Megacharger Site, and Tesla's Home Backup Feature Reaches the Model 3 and Y
California's Fast Charge California Project opened its first application window on October 7 with at least $28 million available, up to $100,000 per port, and applications accepted through January 14. Electrify America is marketing its Powered by Electrify America program, which already supports more than 100 stations and nearly 600 chargers, as a way for retailers to run their own branded networks. Pilot and Tesla opened their first Megacharger site for electric semis on October 8 in Ellabell, Georgia, with six stalls rated up to 1.2 MW. And Tesla's Powershare home backup feature is now available on the Model 3 and Model Y, but it needs a Powerwall 3 and a Wall Connector, and only cars ordered after October 1 are guaranteed to support it.
- Oct 5
Oregon Is Two Years Into NEVI With Zero Fast Chargers Open, EVgo Previews a 750 kW System for 2027, Tesla Posts a Record Supercharging Quarter, and IONNA Passes 180 Sites With New Automaker Discounts
OPB reported on October 2 that Oregon, set to receive more than $52 million in NEVI money over five years, still has no federally funded fast chargers open two years in, though ODOT expects at least one station to start construction this month. EVgo previewed a 750 kW charging system on September 29, built with Delta Electronics, that could charge the fastest EVs sold today in about 10 minutes; deployment slips to 2027, later than the second half of 2026 EVgo projected in 2024. Tesla's third-quarter Supercharging figures show a record 69 million sessions and 2.4 TWh delivered, both up 29% from a year earlier. And IONNA topped 180 U.S. fast-charging sites, with Hyundai and Mercedes-Benz drivers joining BMW in getting a 10% discount through Plug & Charge as of October 1.
- Sep 28
California Signs a Six-Bill Package to Cut EV Charger Permitting Red Tape, Colorado Awards $23.2 Million for 270 More Fast-Charging Ports, PSE&G's Off-Peak Charging Credit Sunsets This Week, and NYC Taps a Brooklyn Startup to Triple Its Curbside Chargers
Governor Newsom signed six bills on September 20 that streamline EV charger inspections, extend streamlined permitting to related site work, and cap permit fees for Level 2 charging at multifamily housing from mid-2027 (2028 in smaller cities and counties) through 2036. Colorado awarded $23.2 million on September 22 to build 270 more fast-charging ports at 35 locations, a 16% jump in the state's existing network. PSE&G's Off-Peak Charging Credit for New Jersey EV owners ends October 1, closing out a program the utility stopped accepting new enrollments for in January. New York City hired Brooklyn-based It's Electric to install more than 600 new curbside Level 2 chargers across the five boroughs over the next three years, nearly tripling the city's pilot network. And the Alliance for Automotive Innovation's Q2 report, released September 24, shows EV sales posted their best quarter since the federal tax credit expired, though volume is still down 20.5% from a year ago.
Ready to subscribe?
By subscribing you agree to our Privacy Policy. Unsubscribe any time.